Bulk Gas Installations and Engineering Drawings


Standard Bulk Installation Site


Professional Engineer (PE) Stamped Drawings for Bulk Tank Installations and Upgrades

What is a Professional Engineer (PE) drawing?

Most municipalities such as cities or states require a professional engineer to assist in designing buildings, expansions, etc. to ensure that they meet local codes and regulations. Bulk oxygen pads fall under this category.  At Air Liquide Healthcare, we are equipped to provide our customers with a PE stamped drawing prior to installing any new pad or expanding an existing pad so that they can satisfy the necessary authorities that their installation is being done per the required standards.


AIR LIQUIDE SUPPLIED

  1. Cryogenic Liquid Storage Tank
  2. Fill Connection
  3. Pressure/Liquid Gauges
  4. Gas Piping From Tank (Vacuum-Jacketed Piping as Required)
  5. Pressure Control Manifold
  6. Vaporizer
  7. *Air Liquide can provide assistance with vendors and contractors for customer supplied items.

    CUSTOMER SUPPLIED

  8. Fence (as Required)
  9. Crash Bollard (as Required)
  10. Liquid Piping to Building
  11. Gas Piping to Building
  12. Concrete Foundation (with Standard Drawings Available from Air Liquide Healthcare)